2012 CRA Category 6 - Design & Remodeling Solutions, LLC 2
Project was to update the existing bathroom and reconfigure space for more efficient closet and storage. The double-sink vanity was transformed into two single-sinks and each were located on either side of the entry door. The shower and tub were changed, and a waterfall feature was added in the tub. The homeowner gained more storage in the bathroom and a closet in the hallway leading to the bathroom was remodeled for better use.
Before:
After:
Contact Design & Remodeling Solutions, LLC:
Cliff Cinamon
Ph: (803) 794-7993