2014 CRA Category 4
This project involved removing the existing shower, double vanity and eliminating the whirlpool tub. A new double vanity with granite countertops was installed that includes a seating area and additional vanity storage space. The vanity has custom mirrors with heavy molding details, sconce lighting set inside the mirrors, and halogen accent lighting. A custom eyebrow mirror was also installed.
The centerpiece of the project is the steam shower. The shower system includes a tile floor, walls and ceiling, as well as framless glass walls and glass door. It also has a sound system and accent lighting!
Before/During:
After:
This project is by:
Palmetto Construction & Renovations
Jim Evatt
Ph. (803) 917-5755